Update Rust crate log to 0.4.21 #70

Merged
pierre merged 1 commits from renovate/log-0.x into master 2024-02-29 00:21:06 +00:00
Owner

This PR contains the following updates:

Package Type Update Change
log dependencies patch 0.4.20 -> 0.4.21

Release Notes

rust-lang/log (log)

v0.4.21

Compare Source


Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [log](https://github.com/rust-lang/log) | dependencies | patch | `0.4.20` -> `0.4.21` | --- ### Release Notes <details> <summary>rust-lang/log (log)</summary> ### [`v0.4.21`](https://github.com/rust-lang/log/blob/HEAD/CHANGELOG.md#0421---2024-02-27) [Compare Source](https://github.com/rust-lang/log/compare/0.4.20...0.4.21) </details> --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzNy4yMTkuNiIsInVwZGF0ZWRJblZlciI6IjM3LjIxOS42IiwidGFyZ2V0QnJhbmNoIjoibWFzdGVyIn0=-->
pierre added 1 commit 2024-02-29 00:12:39 +00:00
Update Rust crate log to 0.4.21
All checks were successful
continuous-integration/drone/pr Build is passing
continuous-integration/drone/push Build is passing
df0cc997cf
pierre scheduled this pull request to auto merge when all checks succeed 2024-02-29 00:12:39 +00:00
pierre merged commit df0cc997cf into master 2024-02-29 00:21:05 +00:00
Sign in to join this conversation.
No reviewers
No Label
No Milestone
No project
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: pierre/MinioK8sBuckets#70
No description provided.