Update dependency @types/react-dom to v18.3.2 #157

Merged
pierre merged 1 commits from renovate/react-dom-18.x-lockfile into master 2024-12-07 02:08:47 +00:00
Owner

This PR contains the following updates:

Package Type Update Change
@types/react-dom (source) devDependencies patch 18.3.1 -> 18.3.2

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [@types/react-dom](https://github.com/DefinitelyTyped/DefinitelyTyped/tree/master/types/react-dom) ([source](https://github.com/DefinitelyTyped/DefinitelyTyped/tree/HEAD/types/react-dom)) | devDependencies | patch | [`18.3.1` -> `18.3.2`](https://renovatebot.com/diffs/npm/@types%2freact-dom/18.3.1/18.3.2) | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzOS41Ni4yIiwidXBkYXRlZEluVmVyIjoiMzkuNTYuMiIsInRhcmdldEJyYW5jaCI6Im1hc3RlciIsImxhYmVscyI6W119-->
pierre added 1 commit 2024-12-07 00:33:22 +00:00
Update dependency @types/react-dom to v18.3.2
All checks were successful
continuous-integration/drone/push Build is passing
continuous-integration/drone/pr Build is passing
da374b5a45
pierre scheduled this pull request to auto merge when all checks succeed 2024-12-07 00:33:22 +00:00
pierre merged commit 5305083eca into master 2024-12-07 02:08:47 +00:00
Sign in to join this conversation.
No reviewers
No Label
No Milestone
No project
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: pierre/VirtWebRemote#157
No description provided.